Electrician continuing education requirements by state
Electrician continuing education requirements by state for 2026: CE hours, renewal cycle, code hours, online limits and what a lapse will cost you.
Most states that license journeymen want 8 to 24 hours of continuing education per renewal, much of it on the NEC, over a cycle of 1 to 4 years. Colorado wants 24 hours every 3 years. Iowa wants 18 every 3 years with 6 on the code. Wisconsin wants 24 over a 4-year term. Michigan only asks for a class after a new code adoption.
The table below is as of 2026, from each board's own page or rule where we could check it. Rows marked "confirm" weren't checked against the board's own page, so call the board before you count on them. Boards change hours when they adopt a new code, so check with your board before you renew. If you're still working toward the card, start with how to get your journeyman license.
01CE hours by state, journeyman level
Each state name links to its board or its rule.
| State | Hours | Per | Code hours and notes |
|---|---|---|---|
| Alabama | None in the rule for journeymen (confirm) | n/a | Contractors 14 hours every 2 years |
| Alaska | 16 | 2 years | 8 on NEC changes (confirm) |
| Arkansas | 8 | NEC cycle | All NEC, board-approved courses |
| California | 32 | 3 years | Plus 2,000 hours worked in the 3 years |
| Colorado | 24 | 3 years | None before your first renewal if you tested in; code split: confirm |
| Connecticut | 4 | 1 year | Done by June 30; none before first renewal |
| Delaware | 5 | 2 years | Masters 10 |
| Hawaii | NEC update course | 3 years | Not maintenance electricians |
| Idaho | Confirm | 2 years from Oct 30, 2026 | Moving to biennial licensing |
| Iowa | 18 | 3 years | 6 on the NEC |
| Kentucky | 6 | 1 year | Two-year license since July 15, 2024, so 12 per renewal |
| Maine | 15 | 2 years | One 15-hour NEC course |
| Maryland | Confirm | Confirm | Board posts approved providers |
| Massachusetts | Confirm | Confirm | Check the board's approved course list |
| Michigan | Code update course | After a new code is adopted | Within 1 year of adoption |
| Minnesota | 16 | 2 years | 12 code, 4 non-code |
| Montana | 16 | Renewal period | 8 on NEC updates; rule text says per year (confirm) |
| Nebraska | 12 | 2 years | 6 NEC (confirm) |
| New Hampshire | 15 | NEC cycle | Code update course (confirm) |
| New Mexico | 16 | 3 years | 8 code (confirm) |
| North Dakota | 8 | 1 year | 4 code; journeymen renew March 31 |
| Oklahoma | 12 | 3 years | 6 code update, 6 code related |
| Oregon | 24 | 3 years | 8 code, 4 Oregon rules (confirm) |
| Rhode Island | 15 | 2 years | NEC or ICC codes (confirm) |
| South Dakota | 16 | 2 years | 8 code; 8 max online |
| Utah | 16 | Licensing period | 12 core |
| Vermont | 15 | 3 years | NEC, plus an energy module |
| Virginia | 3 | 2-year term | One NEC course |
| Washington | 24 | 3 years | 8 code update, 4 RCW/WAC |
| West Virginia | None | Annual license | Confirm |
| Wisconsin | 24 | 4 years | Residential and industrial journeymen 18 |
| Wyoming | 16 | 3 years | 8 on the NEC |
States with no statewide journeyman license don't set CE for journeymen, but local cards can. Kansas law sets 12 hours every two years, or 6 a year, for locally licensed electricians, half of it on the code. North Carolina's CE applies to contractor qualifiers, not hands. The list of states with no statewide journeyman license shows who licenses there instead.
02How to read your number
Look at three things on your board's page: the hours, the period, and how many must be on the code.
- Per year vs per cycle. Connecticut's 4 hours is every year. Iowa's 18 is spread across a 3-year license. Over 3 years that's 12 in Connecticut and 18 in Iowa.
- Code hours. Minnesota wants 12 of 16 on the code. Washington wants 8 code update hours and 4 on Washington's electrical law and rules (RCW 19.28 and WAC 296-46B). A 16-hour safety class won't cover a code requirement.
- Board-approved courses only. Arkansas counts only courses its board approved, and the course provider's roster is "the only document acceptable" as proof. North Dakota says every course, "classroom, webinar, online and correspondence, must be board approved."
- First renewal breaks. Connecticut says no CE before your first renewal. Minnesota says none in the first year of a master license. Arkansas apprentices who finish and pass the journeyman exam owe nothing more that NEC cycle.
03Can you do it online?
Most boards take online hours from approved providers, but a few cap them.
South Dakota's rule allows "only 8 hours" of its 16 from pre-approved online courses, per the South Dakota Electrical Commission. The other 8 can't come from online courses. North Carolina's contractor qualifiers can do 4 of their 8 yearly hours online. For every other state, check your board's approved provider list before you pay for a course, because a course that isn't on the list counts for nothing.
04Do CE hours from one state count in another?
Sometimes, and only when the board says so in writing.
- Montana accepts CE approved by its reciprocal states (confirm).
- Rhode Island lets out-of-state licensees submit their own state's 15-hour credit if it meets Rhode Island's rules and that state accepts Rhode Island certificates (confirm).
- North Dakota wants reciprocity applicants from a state with no CE to show a North Dakota approved 8-hour code class.
- Wyoming wants anyone who failed a Wyoming exam to hold the home license 3 years and show 16 hours of CE, 8 on the code, before reciprocating.
If you carry cards in two or three states, keep a separate log for each board. One NEC update class can count in several states only if each board approved it. Our guide to moving your license to another state covers the rest of a multi-state setup.
05What a lapse costs
Miss the deadline and some boards charge a late fee, while others make you test again.
| State | What happens |
|---|---|
| Wyoming | 45-day grace with a $50 late fee; after that, retest. A reciprocated card can't be reciprocated again |
| Washington | Fees double after expiration; expired more than 90 days, "retest is your only option" |
| California | Expired certification means a retest and $200, though you skip the 32 hours |
| Kentucky | 60-day grace period after your birth month deadline |
| Arkansas | Can't renew until the CE is done and all fees and penalties are paid |
| West Virginia | Lapsed more than 12 months means retest (confirm) |
Wyoming is the hard one. The Wyoming Department of Fire Prevention and Electrical Safety tells a hand whose reciprocated card lapses, "you are not eligible to reciprocate your license again." He tests. Lose that card and you lose the shortcut for good.
06New code, new class
A new NEC adoption is when CE rules bite hardest.
Minnesota's Board of Electricity adopted the 2026 NEC effective August 17, 2026, and moved licensing exams to it on September 8, 2026. Arkansas has adopted the 2026 NEC too. Michigan only requires a code update course "within one year of new code being adopted," so a Michigan hand can go years with no CE and then owe a class on a deadline. When your state adopts a new code, take the update class early. You'll want it on the job before the inspector does.
07A renewal checklist that works
Five minutes a year keeps you off the retest list.
- Write your license expiration date in your phone with a 90-day reminder.
- Pull your board's CE page and note hours, code hours and any online cap.
- Take courses only from the board's approved list, and keep every certificate.
- Check that the provider reported your hours if your board tracks them online (Arkansas uses StateReporting.com).
- Renew before the deadline, not in the grace period. Grace periods cost money and Wyoming's runs out in 45 days.
- If you hold a reciprocal card, renew it first. It's the one you can't get back.
Some shops pay for CE and code books and some don't. Ask before you take a new job, the same way you'd ask about the truck. Our license requirements by state has the rest of each state's rules.
Run your Pay Check to see what electricians with your license make near you. Takes about a minute and your boss never hears about it.
See what your license pays near you.
Tap a few answers and see what electricians with your license make in your area. Free, about a minute, and your boss never hears about it.
Get my Pay CheckFAQFAQs
How many CE hours do I need to renew my electrician license?
It depends on the state. Most licensing states fall between 8 and 24 hours per renewal: Iowa 18 per 3 years, Minnesota 16 per 2 years, Washington 24 per 3 years, Wisconsin 24 per 4 years. Check your board, since hours change with new code adoptions.
Which states don't require continuing education for electricians?
Alabama's rule has a CE line for contractors but none for journeymen. West Virginia is reported to have none for journeymen and masters, but confirm with the State Fire Marshal. Michigan only requires a code update course after a new code is adopted.
Can I take electrician CE online?
Usually, if the course is board approved. South Dakota caps online courses at 8 of its 16 hours, and North Carolina's contractor qualifiers can do 4 of their 8 hours online. Check the approved provider list first.
What happens if I don't finish my CE on time?
Most boards won't renew you until it's done, and some add late fees. In Wyoming, renewing more than 45 days late means retesting. In Washington, a certificate expired more than 90 days can only come back by retesting.
Do I need CE in my first renewal?
Not always. Connecticut requires none before the first renewal, Minnesota requires none in the first year of a master license, and Arkansas apprentices who pass the journeyman exam owe none for the rest of that NEC cycle.
Sources
- Iowa Code chapter 103, section 103.18, License renewal and continuing education
- Wisconsin Administrative Code ch. SPS 305 (license terms and CE)
- Wisconsin DSPS, Journeyman Electrician
- Colorado State Electrical Board
- Montana State Electrical Board, Continuing education
- North Dakota State Electrical Board, Reciprocal license agreements and requirements
- Minnesota DLI, Continuing education, electrical
- Minnesota DLI, Electrical codes and standards
- South Dakota Electrical Commission, Licensing and CE
- Wyoming Department of Fire Prevention and Electrical Safety, Licensing
- Washington L&I, Electrician certificate and renewal
- California DIR Electrician Certification Unit, FAQ
- Arkansas Board of Electrical Examiners, Rules, 17 CAR Part 210
- Connecticut DCP, Electrician continuing education
- North Dakota State Electrical Board, Continuing education requirements
- Utah DOPL, Electrical continuing education
- Kansas Statutes 12-1526
- Michigan LARA, Electrical examination and licensing information
- Vermont Statutes, Title 26, Chapter 15
- Virginia DPOR, Tradesmen
- Kentucky 815 KAR 35:060
- Delaware Board of Electrical Examiners
- NC State Board of Examiners of Electrical Contractors, Continuing education
